[1]
Messah, Y.A. et al. 2013. KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTUKSI GEDUNG DI KOTA KUPANG. Jurnal Teknik Sipil. 2, 2 (Sep. 2013), 157–168. DOI:https://doi.org/10.35508/jts.2.2.157-168.