Messah, Y. A., Widodo, T., & Adoe, M. L. (2013). KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTUKSI GEDUNG DI KOTA KUPANG. Jurnal Teknik Sipil, 2(2), 157–168. https://doi.org/10.35508/jts.2.2.157-168